PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavation for the underground sanitary sewer Facing South (800x600).jpg Saw cutting Rahway ave Facing the bridge from the 3rd Floor (800x600).jpg Starting installing safety rails at Elev. 1,2,3 (1st Floor) Facing South (800x600).jpg Stripping the shear wall panels at Elev. 5,6 (3rd Floor) Facing West (800x600).jpg Continued installing pour stops around Derrick -3 (2nd Floor) Facing North-West (800x600).jpg Excavating for the sanitary sewer from column line G-J to 4-5 Facing West (800x600).jpg Stair -5 before concrete pour Facing West(800x600).jpg
Previous pageNext page Stripping the shear wall panels at Elev. 5,6 (3rd Floor) Facing West (800x600)
Stripping the shear wall panels at Elev. 5,6 (3rd Floor) Facing West (800x600)